freiberufler SAP Senior Consultant auf freelance.de

SAP Senior Consultant

offline
  • auf Anfrage
  • 560421 singapore
  • auf Anfrage
  • id  |  en
  • 28.12.2012

Kurzvorstellung

• 8 years of experience in SAP PP/PPPI, MM, WM, VC, QM & IS-Mill Module of which 8 years in functional configurations.
• Have 11 SAP projects handled and successfully implemented of which 5 full cycles SAP PP/PP-PI, MM, VC, QM, WM & IS-Mill implement

Qualifikationen

Projekt‐ & Berufserfahrung

SAP Senior Logistic Consultant
Diageo, California, Napa County
3/2012 – 11/2012 (9 Monate)
Beverage Industry
Tätigkeitszeitraum

3/2012 – 11/2012

Tätigkeitsbeschreibung

Diageo is the world's leading premium drinks business with an outstanding collection of beverage alcohol brands across spirits, beer and wine. These brands include Johnnie Walker, Crown Royal, J&B, Windsor, Buchanan's and Bushmills whiskies, Smirnoff, Ciroc and Ketel One vodkas, Baileys, Captain Morgan, Jose Cuervo, Tanqueray and Guinness.

This is a roll out project to implement SAP Diageo global template solution for Wine business unit in US – California where 6 new plant need to be added into current Diageo global template solution. In this roll out project my role is as Senior SAP logistic in charge of SAP PPPI, MM, LE and WM modules.
The project Implementation scope involve: Fit gap analysis, Create business template for specific requirement, configuration, integration test, UAT test, Data migration and Support go live for all 6 Wine manufacturing plant.

PPPI scope includes: Master recipe, Resource, BOM, Process Order, MRP.

MM scope includes: Scheduling agreement, PR, PO, PO subcontract, material consumption, batch management, PO-STO, Inventory management.

LE & WM scope include: outbound delivery, Transfer request, Transfer Order, Transfer Order Confirmation, WM stock movement.

SAP Senior Consultant
Tognum, singapore
11/2010 – 3/2012 (1 Jahr, 5 Monate)
Maschinen-, Geräte- und Komponentenbau
Tätigkeitszeitraum

11/2010 – 3/2012

Tätigkeitsbeschreibung

Tognum Asia Pte Ltd is the Asia arm of Tognum AG. Tognum AG one of the leading worldwide manufacturers of large diesel engines and complete drives systems. The diesel engines and drive systems are used in ships, heavy land vehicles and rail vehicles, industrial application and onsite power generation plants.

This is a green field project to implement SAP ECC 6.0 into spare part and after sales service new business unit at Tognum America.

In this project Setiawan in charge of SAP PP module, responsible to do, configuration, UAT test and go live support. PP implementation scope: SOP Flexible planning, Demand Planning, Long Term Planning, MRP and Consumption based planning.

SAP Senior Logistic Business Analyst
Silicon Laboratories, singapore
9/2008 – 11/2010 (2 Jahre, 3 Monate)
Semiconductor
Tätigkeitszeitraum

9/2008 – 11/2010

Tätigkeitsbeschreibung

In charge of SAP PPPI/VC/MM global roll out project across ASIA Pacific and do fit and gap analyst from current global template and create business template for specific entity, configuration for specific entity, Integration test, UAT test, Data migration and Support go live.
This roll out project is involving 4 production site which are located in 4 different countries (Singapore, Taiwan, Korea and Malaysia).

PPPI & VC scopes include integration with PI sheet, Process message, process order, product costing, BOM, Master recipe, resource, material configurable, object dependencies, batch management, batch derivation, classification, handling unit and PO subcontracting.

MM scopes include Inventory management, Purchasing, Sub contract, STO.

SAP Senior Consultant
Biosensors Interventional, singapore
4/2008 – 9/2008 (6 Monate)
Medical Device
Tätigkeitszeitraum

4/2008 – 9/2008

Tätigkeitsbeschreibung

Roll out project, where the global business template already created during “Biosensors International” implementation. As a team lead, I'm in charge of SAP PP/QM team. As a Team Lead PP/QM, I'm responsible for creating actions plans, Task assignments and Lead team through all the project phases and made the technical knowledge transfer and QA for all the customization done by the team. As team lead, report directly to the Project Manager and The PP/QM consist of 2 consultant and 1 team lead.

PP/QM scope includes integration with SOP, DM, MRP, CRP, SFC, using PP for discrete Manufacturing, batch management, classification, PO subcontracting and Quality Goods receipt for production order.

SAP Senior Consultant
Biosensors International, singapore
2/2007 – 3/2008 (1 Jahr, 2 Monate)
Medical Device
Tätigkeitszeitraum

2/2007 – 3/2008

Tätigkeitsbeschreibung

This is a big bang project implementation involving 4 production plant site (US, Singapore, Japan and Netherlands). I'm in charge of SAP PP/QM module and responsible for creating global business template and do fit gap analyst for specific country requirement, configuration for global and specific entity, Integration test, UAT test, Data migration and Support go live.

PP/QM scope includes integration with SOP, DM, MRP, CRP, SFC, using PP for discrete Manufacturing, batch management, classification, PO subcontracting and Quality Goods receipt for production order.

SAP Senior Consultant
Mulia Glass, Mulia Glass Container, Mulia Glass Sa, Indonesia
1/2006 – 2/2007 (1 Jahr, 2 Monate)
Glass Manufacture
Tätigkeitszeitraum

1/2006 – 2/2007

Tätigkeitsbeschreibung

Mulia Industry is one of the biggest multinational industries in Indonesia. This project was a big and complex SAP implementation. This Implementation impacted three different entities and nine manufacturing sites at the same time, such as: PT Mulia Glass Float (four manufacturing sites), PT Mulia Glass Container (four manufacturing sites), and PT Mulia Glass Safety (one manufacturing sites).

My role in this project is a team Lead for PP-PI/QM/IS-MILL module and I'm responsible for creating actions plans, Task assignments and Lead team through all the project phases and made the technical knowledge transfer and QA for all the customization done by the team. As a team lead, report directly to the Project Manager. This team consist of 3 consultant and 1 team lead.

PPPI/QM/IS_MILL scopes include integration with SOP, DM, MPS, MRP, CRP, SFC, order combine, product costing, batch management, classification, Handling Unit, object decencies, Incoming inspection, In process inspection and goods receipt inspections.

SAP Consultant
Mulia Ceramic, Indonesia
8/2004 – 12/2005 (1 Jahr, 5 Monate)
Floor Tile and Wall Tile Manufacture
Tätigkeitszeitraum

8/2004 – 12/2005

Tätigkeitsbeschreibung

This is an end to end implementation where the Implementation impacted eight manufacturing sites within Mulia Industry: Floor Tile Manufacturing (four sites) and Wall Tile Manufacturing (four sites). Eight Manufacturing site become one Plants got into SAP environment at the same time as part of a strategic business decision to obtain SAP 4.71 as core system for all business processes.

I'm responsible for PP-PI/QM/IS-MILL module, involve in a full cycle implementation from Designing blue print, configuration/customizing, Integration testing, UAT, Data migration and Support go live.

SAP PP-PI/QM/ IS_MILL feature implemented in this project: Sales Operation Planning, Master Planning Scheduling, Capacity Requirement Planning, Process Order Processing, Product costing, MRP, MPS, Handling Unit, Object dependencies, Order combination, incoming inspection, in process inspection and goods receipt inspection.

Zertifikate

• SAP Certified Consultant SCM – Planning & Manufacturing with my SAP ERP
2009

Über mich

• 8 years of experience in SAP PP/PPPI, MM, WM, VC, QM & IS-Mill Module of which 8 years in functional configurations.
• Have 11 SAP projects handled and successfully implemented of which 5 full cycles SAP PP/PP-PI, MM, VC, QM, WM & IS-Mill implementations, and 6 rollouts project implementation across the globe.
• Hands-on and leadership experience across a range of logistics functions including: production planning, inventory management, customer service, forecasting, transportation and distribution with a diverse group of companies, products, and services.
• 8 years experience in various manufacturing industry. Such us: Beverage alcohol, Ceramic manufacture, Glass manufacture, Safety glass manufacture, Container manufacture, Medical device manufacture, Semiconductor manufacture, large diesel engines and complete propulsion systems.
• Experience in project team lead that includes project planning of all phases of systems development life-cycle, time management, leading the project team, execution of the plan, Go-Live to roll-out implementation.
• Experienced in identifying and documenting the business requirements and functional specifications of the clients.
• Experienced in documenting systems designs, database designs including tables & data dictionary, screen and forms layouts, reports contents, prototypes, program specifications, computational rules, and other business rules.
• Experienced in formulating and documenting new processes, process re-engineering and process streamlining that includes new policies, guidelines, and controls.
• Experienced in leading the Team, development of Test Plan, creation of test documentations, and execution of testing activities.
• Experienced of conducting End-User training and documenting End-User Training Manual and Training Plan.

Weitere Kenntnisse

Areas of Specialization
• SAP R/3 – Production Planning & Process Industry
• SAP R/3 – Material Management.
• SAP R/3 – Warehouse Management
• SAP R/3 – Variant Configuration
• SAP R/3 - Quality Management
• SAP R/3 – Industry Solution Mill (SAP-IS MILL)

Persönliche Daten

Sprache
  • Englisch (Fließend)
  • Indonesisch (Muttersprache)
Reisebereitschaft
auf Anfrage
Profilaufrufe
1439
Alter
43
Berufserfahrung
19 Jahre und 9 Monate (seit 07/2004)

Kontaktdaten

Nur registrierte PREMIUM-Mitglieder von freelance.de können Kontaktdaten einsehen.

Jetzt Mitglied werden